Case study Case Study

Getjar choose Frost balcony outlets

Frost roof and floor gullies were chosen by Getjar to be used on their project, Plaistow Hub, as a cost-effective alternative. Known for its quality, price and service, Frost is the preferred choice of outlet for Getjar on all their projects.
Builder
Client

Getjar Limited

Location
Location

Plaistow Hub, Plaistow, London Road, London E13 0DN

Bulb
Solutions

Frost

About Plaistow Hub

The Plaistow Hub, E13 is a large project providing 182 new homes and a new library, gym, supermarket and cafes.  This is split between two buildings ranging from 15 to 23 floors.  Over 200 Frost outlets were installed on this project with the majority being balcony outlets.  Other types of outlets were used to suit cold roof applications and parapets.  Frost worked with the architect and engineers to provide the best solution for the drainage outlets.

Plaistow Hub London during construction Getjar
plaistow hub building work getjar
Aerial view of Plaistow Hub during construction
Plaistow Hub during construction close up