Getjar choose Frost balcony outlets
Getjar Limited
Plaistow Hub, Plaistow, London Road, London E13 0DN
Visit site
Frost
About Plaistow Hub
The Plaistow Hub, E13 is a large project providing 182 new homes and a new library, gym, supermarket and cafes. This is split between two buildings ranging from 15 to 23 floors. Over 200 Frost outlets were installed on this project with the majority being balcony outlets. Other types of outlets were used to suit cold roof applications and parapets. Frost worked with the architect and engineers to provide the best solution for the drainage outlets.
More case studies
M&J Evans Construction adopt the MuckStopper system
When the roads and sewers team from M&J Evans Construction Ltd (North West) began work at a 400-unit Taylor Wimpey development site in David Whitby Way in Crewe, they knew the extended period of the development project would present challenges in terms of keeping manholes and road gullies free of silt.
Joseph Gallagher install Frost Gullies at Grand Union
Grand Union is a vibrant new canalside neighbourhood by St George. Located close to Wembley with great connections into Central London.
L4 Civil Engineering
We interviewed Steven Lattimore the MD of L4 Civils, to get his views on SiteStak and how it works for them when installing underground drainage on their sites.