Norcon Construction Excavator
Case study Case Study

Next-level tidiness for Norcon Construction

Norcon Construction have their on-site storage of plastic drainage pipework and fittings managed efficiently with SiteStak.
Builder
Client

Norcon Construction

Location
Location

East Yorkshire, YO25 9FR

Bulb
Solutions

SiteStak

Norcon Construction SiteStak Workstations

With offices in Driffield, East Yorkshire and Redditch, Worcestershire, Norcon Construction work with many of the biggest housing developers across the UK and within an 80-mile radius of the two offices.

Their on-site storage of plastic drainage pipework and fittings is managed efficiently with SiteStak, a self-contained mobile storage system and workstation.

SiteStak brings many benefits, including:

  • reduced wastage due to damaged or mislaid materials
  • improved site safety
  • more accurate stockholding to ensure uninterrupted pipework installation
  • cleaner, safer pipework cutting and preparation

Norcon also chose to have their SiteStak workstations painted in a custom dark grey that reflects the professionalism of their company and services.