Anderson Group SiteStak Workstation Michael Keeley
Case study Case Study

Anderson Group

Chelmsford, Essex, construction company Anderson Group liked the SiteStak system but wanted custom modifications to the design to meet their needs.
Builder
Client

Anderson Group

Location
Location

Chelmsford, CM2 5PW

Bulb
Solutions

SiteStak

Anderson Group SiteStak Workstation Drainage Store

Chelmsford, Essex construction company Anderson Group liked the SiteStak system but wanted custom modifications to the design that would meet their own needs.

Without a secure storage point, plastic pipes and fittings are at risk of damage from construction vehicles, being mislaid and even creating a trip hazard.

SiteStak Pipe Cutting Guide Anderson Group

SiteStak mobile workstations are the perfect solution to safe, efficient site storage and provide a single location where surplus fittings can be returned and stored for later use. They also incorporate a handy workstation where pipe can be cut and prepared for installation.

Working with our design and fabrication teams we modified the standard SiteStak workstation to incorporate an entirely bespoke workstation with a lockable lid and a lockable toolbox.

More case studies

Truck Delivery options

Enter your postcode for delivery timescales, accurate stock levels, and your nearest depot