Anderson Group
Chelmsford, Essex construction company Anderson Group liked the SiteStak system but wanted custom modifications to the design that would meet their own needs.
Without a secure storage point, plastic pipes and fittings are at risk of damage from construction vehicles, being mislaid and even creating a trip hazard.
SiteStak mobile workstations are the perfect solution to safe, efficient site storage and provide a single location where surplus fittings can be returned and stored for later use. They also incorporate a handy workstation where pipe can be cut and prepared for installation.
Working with our design and fabrication teams we modified the standard SiteStak workstation to incorporate an entirely bespoke workstation with a lockable lid and a lockable toolbox.
More case studies
Stave-Con 'doing the right thing' with the SiteStak system
Stave-Con Ltd is a Civil engineering company in Wolverhampton, England, they provide civil engineering solutions to some of the UK’s biggest developers.
Joseph Gallagher install Frost Gullies at Grand Union
Grand Union is a vibrant new canalside neighbourhood by St George. Located close to Wembley with great connections into Central London.
We are proud to work with Carey Group
Carey Group Ltd is a family-owned business that has been operating in the UK since 1969, the company was founded by John, Tom and Pat Carey.