Stave-Con 'doing the right thing' with the SiteStak system
On large-scale projects such as these, Stave-Con needs to work within tight schedules. Materials must be accessible and kept safe from being damaged or mislaid. For this reason, SiteStak is the perfect solution to their drainage materials storage requirements, and Stave-Con chose the larger 4.9-metre version for their needs. The SiteStak workstation is immediately identifiable wherever it is placed, ensuring groundworkers can quickly locate the materials they need to keep the project on schedule.
More case studies
A Godsend for Gracelands Groundworks
Materials wastage reduction was a key issue when Hampshire civils company Gracelands Ltd decided to invest in SiteStak systems. "SiteStak is a godsend"
Next-level tidiness for Norcon Construction
Norcon Construction have their on-site storage of plastic drainage pipework and fittings managed efficiently with SiteStak.
A modern approach to quality and safety for NRI Civils
NRI Civils Ltd is a building contractor that specialises in civil engineering, offering groundworks, site clearance and drainage installation.